Anniston: Quality

This page provides links to the supplier quality requirements, as referenced on BAE Systems orders, and the associated forms and information which supports those requirements.

Page Content.

Any questions regarding quality requirements/documents can be directed to ray.jenkins@baesystems.com.


Please choose the appropriate document.


Quality Notifications
Subject Release Date
CDR Paperwork Submittal Packages 05/03/2017
Ballistic Material Hardness Testing 04/27/2017
Written Corrective Action Request (WCAR) 12/08/2016
First Piece First Article Checklist Work Instructions Release Notice 05/16/2016
Revised Source Inspection Request Form Release Notice 04/21/2016
SQAM/CDR Revision 05 Release Announcement 10/26/2015
CARC Paint Applicators and Suppliers 02/05/2015
Recent Quality Issues 03/25/2014
Hexavalent Coating 03/25/2014
CARC Paint 10/02/2013
CDR 046 Change 02/13/2013

Back To Top of Page

CURRENT Supplier Quality Assurance Manual (SQAM)/Contract Deliverable Requirements (CDR)
Subject Effective Date
SQAM, Rev 06 11/28/2016
SQAM, Rev 06 (Summary of Changes) 11/28/2016
CDR, Rev 10 03/06/2017
CDR Rev 10 (Summary of Changes) 03/06/2017

Back To Top of Page

PREVIOUS Supplier Quality Assurance Manual (SQAM)/Contract Deliverable Requirements (CDR)
Subject Effective Date
SQAM, Rev 05 10/26/2015
SQAM, Rev 05 (Summary of Changes) 10/26/2015
SQAM, Rev 04 05/15/2015
SQAM, Rev 03 04/13/2015
SQAM, Rev 03 (Summary of Changes) 04/13/2015
SQAM, Rev 02 01/14/2014
SQAM, Rev 01 09/03/2013
SQAM Rev 00 11/27/2012
CDR, Rev 09 11/28/2016
CDR Rev 09 (Summary of Changes) 11/28/2016
CDR, Rev 08 05/09/2016
CDR Rev 07 & 08 (Summary of Changes) 05/09/2016
CDR, Rev 07 01/14/2016
CDR, Rev 06 01/11/2016
CDR Rev 06 (Summary of Changes) 01/11/2016
CDR, Rev 05 10/26/2015
CDR Rev 05 (Summary of Changes) 10/26/2015
CDR, Rev 04 04/13/2015
CDR, Rev 03 01/15/2014
CDR, Rev 02 09/20/2013
CDR, Rev 01 09/03/2013
CDR, Amendment A 06/05/2013
CDR Rev 00 11/27/2012

Back To Top of Page

Supplier Quality Requirements (SQR)/Procurement Quality Requirements (PQR)
Revision Release Date
SQR Rev 04 Amendment B 05/01/2012
SQR Rev 04 Amendment A 08/26/2011
SQR Rev 04 (Revised 5/1/2011) 05/27/2011
PQR Rev 03 Amendment B 11/01/2010
PQR Rev 03 Amendment A 04/30/2011
PQR Rev 03 12/01/2009
PQR Rev 02 03/01/2009
PQR Rev 02 (Summary of Changes) 03/01/2009
PQR Rev 01 02/01/2006
PQR Rev 00 Amendment A 06/27/2005
PQR Rev 00 01/01/2003

Back To Top of Page

Forms
Form # Document Title Release Date
089689, Rev 01 Supplier CDR or Source Submission Cover Sheet effective 06/19/2017
088206, Rev - First Piece-First Article Checklist Work Instructions effective 05/23/2016
089475 Procedure Qualification for Thermal Cutting of Steel Armor effective 01/14/2016
088601 High Strength Fastener Certification effective 05/28/2014
092245, Rev 9 Source Inspection Request/Approval Form 06/20/2016
096084, Rev 6 Production Part Approval Process Submission Form 12/10/2012
USCS-6130 Panel Submission Form 08/2011
092255, Rev 3 CARC Panel Submission Form 10/22/2012

Back To Top of Page

Approved Painter List
Document Release Date
Approved Painter List 11/01/2017

Back To Top of Page

Please contact your Authorized Procurement Representative to receive the following Weld Documents:

Document
Doc ID Document
092585 BAE Systems L&A Weld Procedure Book Steel
092586 BAE Systems L&A Weld Procedure Book Aluminum
092579 Standard Repair Procedure/Repair of Steel Base Metal
092580 Standard Repair Procedure/Repair of Aluminum Base Metal
UDLP-A5.10 Specification for Bare Aluminum and Aluminum Alloy Welding Electrodes and Rods (Optional)

Back To Top of Page

The following Weld Documents are available below. Click on the applicable document(s):

Weld Documents
Doc ID Document Release Date
092587 WE-005 Supplier Weld Procedure Process 05/05/2015
092567 Ground Combat Vehicle Code-Aluminum (12472301) 04/30/2003
082566 Ground Combat Vehicle Code-Steel (12479550) 04/30/2003

Back To Top of Page

Weld Forms
Form # Document Title Release Date
089136 LAA-5128 Weld Procedure Submission Form 03/09/2015
091866 LAA-5130 Brazing or Braze Welding Procedure 05/05/2015
091868 LAA-5131 Recorded Joint Welding Procedure for Resistance Welding 03/10/2015
091869 LAA-5272 Weld Submittal Requirements and Instructions 07/20/2016

Back To Top of Page






Copyright 2017 - BAE Systems - All rights reserved